Resource Allocation
Optimized production flow · last generated 2026-07-26 09:14
Raw Aluminum
4,240 units in stock
Raw Steel
2,680 units in stock
Raw Enclosure
1,380 units in stock
Tool A1 — CNC
88.0h · $1,760
Tool D4 — Cutting
21.5h · $687
Tool C3 — Assembly
26.1h · $731
Tool B2 — Welding
32.9h · $789
on Tool A1
Lena Chen
70.5h · $1,973
on Tool D4
Luc Lopez
15.4h · $570
on Tool C3
Pablo Jain
26.1h · $810
Elena Khan
16.3h · $358
Priya Khan
9.9h · $276
Chen Khan
9.9h · $336
on Tool B2
Mia Chen
32.9h · $1,118
Ravi Nakamura
32.9h · $1,216
Product A — Aluminum Bracket
4,240
ETA Day 4
Product B — Steel Gear
2,680
ETA Day 3
Product C — Enclosure Panel
1,380
ETA Day 2
Operators used
8
minimized from 11
Total labor-hours
213.7
across all shifts
Total cost
$10,624
machine + labor
Revenue / profit
$135,594
revenue $194,640 − materials $48,423
Completion
Day 4 of 7
3 days of slack
Convergence
GA converged in 200 gens · 18% cheaper than baseline
Operator Gantt
7-day schedule · gaps are breaks / cool-off periods
Constraint checks
18 of 20 rules satisfied
